Test of the Lahore track orange line project in Pakistan goes well

On May 16, the Lahore rail transit orange line project carried out a subway cold-slip trial run in an overhead station section in accordance with the owner's instructions.

The trial run starts from the north depot and is carried out by the double repetitive combination of diesel locomotives. It runs along the main line to the No. 11 subway station. The distance is about ten kilometers. The round-trip time runs at a maximum speed of 20 kilometers per hour.

PRINT CLOSE